Wednesday, January 16, 2013

Renewal Survey

Renewal surveys
Frequency

The renewal survey, as required by the relevant regulations and as shown diagrammatically in the harmonized system of survey and certification diagrammatic arrangement, should be held before the appropriate certificate is renewed.

General

The renewal survey should consist of an inspection, with tests when necessary, of the structure, machinery and equipment to ensure that the requirements relevant to the particular certificate are complied with and those they are in a satisfactory condition and are fit for the service for which the ship is intended.

The renewal survey should also consist of a check that all the certificates, record books, operating manuals and other instructions and documentation specified in the requirements relevant to the particular certificate are on board the ship.


!Just on time!










Resolution A.997(25)E
Resolución A.997(25)S
Resolution A.1020(26)E
Resolución A.1020(26)S
IACS Survey and Certification